Bahçelik Barrage and HEPP
Bahçelik Hydroelectric Power Plant, the second power plant of our company, was built at the outlet of the Bahçelik Dam bottom spillway, which was built on Zamantı River, and was commissioned in May 2006.
Facility Name | : Bahçelik Barrage and HEPP |
Facility Location | : Bahçecik Village |
Purpose | : Irrigation / Energy Generation |
Basin | : Seyhan |
Water | : Zamantı Stream |
Facility Type | : Barrage Skirt Power Plant |
Investment Start Date | : 06/2005 |
Entry Date to Trial Business | : 06/2005 |
Provisional Acceptance Date | : 05/31/2006 |
Body Fill Type | : Clay Core Rock Fill |
Maximum Water Level | : 1500.00 m |
Minimum Water Level | : 1472.00 m |
Installation Power | : 4.22 MWh |
Net Head | : 48.75 m |
Turbine Type | : Horizontal Axis Francis |
Unit Quantity | : 2 |
Annual Production Capacity | : 30.02 GWh |